General contractor

Selected assignments of Polbet S.A. as general contractor

Item General Contractor/Investor Object
1

KAY Investments Sp. z o.o. Warszawa
ul. Sienna 39

Building of housing complex with underground garages and necessary communication services, appliances of accompanying infrastructure and elements of small architecture in Warszawa Dywizjonu 303 Street performed in the general contractor system.

  • Development area: 2 204,31 m2
  • Number of storeys - 5
  • Total underground surface - 3,226.96 m2
  • Total surface on the ground - 8,670.71 m2
  • Usable floor area of apartments - 6,353.64 m2
  • Parking spaces - 106
  • Cubature 37 367,46 m3

Performance time: June 2007 until September 2008

Net value of work: 24,912,465 PLN

2

EURO-KAS Sp. z o.o
Katowice
ul. 73 Pułku Piechoty 1

Development of VOLVO Showroom and Technical Assistance Service in Katowice.

Works performed by us as General Contractor (this includes earth work, foundations, hydroinsulation of foundations, flooring, floor and roof, joinery and metalwork, floor plaster work and finishing elements, mechanical systems - air-conditioning, ice water, central heating, water supply and sewage system, external networks, ventilation system, wiring systems including strong and weak-current wiring systems, fire-protection, logical systems). Surface of development area approximately 3000 m2.

Performance date: June 2007 until now

Net value of work: approximately 8,000,000 PLN (post-contractual settlement)

3

Spóldzielnia Mieszkaniowa Lokatorsko Własnościowa "Energetyk"

ul. Powstańców Śląskich 159, Wrocław

Removal of fire damages of terrace and the located underneath it garage complex in 3-7 Dokerska Street in Wrocław which includes:
  • Exchange of floor slabs damaged by the fire;
  • Workmanship of levelling layer for terrace surface;
  • Workmanship of Dualseal membrane insulation;
  • Workmanship of terrace surface of terrazzo tiles;
  • Performance of restoration work;
  • Performance of fire protection for steel structure and floor slabs in Conlit technology;
  • Paintwork;p>
  • Workmanship of wiring system, sanitary system and ventilation system

Performance time: July 2007 until now

Value of Work: 1,006,669.29 PLN

4

DTC RENOMA Sp. z o.o.
WARSZAWA
ul.Krucza 50

Modernization of office on floors 4, 5 and 6 in the Renoma Shopping Centre in Wrocław, ul. Świdnicka 40 "- building under protection of the Municipal Conservator of Historical Buildings.

Scope of conducted work:

  • Demolition work;
  • Reinforced-concrete building work;
  • Building work with steel structure (performance of reinforcements and new structure);
  • Work connected with restoration and repair of building structure after the fire
  • Exchange of window joinery;
  • Finishing work - offices with high-standard (this includes elevated floors, acoustic ceilings);
  • Internal aluminium joinery;
  • Renovation of historical concrete dome in former Ballroom together with renovation of suspended structure;
  • Installation of air-conditioning and ventilation system;
  • Mounting of water-supply and sewage system;
  • Mounting of wiring systems;
  • Performance of BMS;
  • Performance of SAP and DSO systems;
  • Mounting of structures and appliances on the roof;
  • Preparation of performance project for the whole scope of work

Total surface covered by building work i.e. floors IV, V and VI of the building without roof surface amounts to 9,480 m2.

Performance time: April 2006 December 2007

Net value of work: 27,740,020.- PLN

5

"DTC REAL ESTATE " S.A.
WARSZAWA
ul.Krucza 50

Performance of demolition and building work in the RENOMA Shopping Centre building in Wrocław ul. Świdnicka 40 "- building under protection of the Municipal Conservator of Historical Buildings.

Scope of conducted work:

  • Demolition work 3rd floor
  • Demolition work 4th, 5th floor
  • Floor repair 4th floor
  • Preparation of office space 3rd floor - general building work

Performance time: March - December 2006

Net value of work: 1,975,000.- PLN

6

SKANSKA S.A.
Warszawa
ul. Gen. J.Zajączka 9

Complex roofing work and workmanship of "green roof" of the Shopping and Service Centre "Złote Tarasy" next to the Central Railway Station in Warszawa. The scope of work included preparation of the project as well as the delivery and performance of a complete roofing system, green roofs and terraces in Hydrotech (USA) system with a total surface of approximately 25,000 m2

Performance time: November 2004 June 2007

Net value of work: 8,018,540.- zł

7

SKANSKA S.A.
Warszawa
ul. Gen. J.Zajączka 9

Complex performance of roofing and "green roof of the Shopping and Service Centre "Złote Tarasy" next to the Central Railway Station in Warszawa. The scope of work included preparation of the project, as well as the delivery and performance of a complete roofing system, green roofs and terraces in Hydrotech (USA) system with a total surface of approximately 25,000 m2

Performance time: November 2004 June 2007

Net value of work: 8,018,540.- zł

8

METRO Group Asset Management Polska Sp. z o.o.
Warszawa
al. Krakowska 61

Reconstruction of Makro Supplies Centre in Sosnowiec which included:

  • Demolition work;
  • Assembly of steel structure;
  • Reinforced-concrete work;
  • Roofing work;
  • Flooring work;
  • Earth work;
  • Road work.

Performance date - June 2006 - February 2006

Net value: 4,379,920.- zł

9

METRO Group Asset Management Polska Sp. z o.o.
Warszawa
al. Krakowska 61

Reconstruction of Makro Supplies Centre in Zabrze which included:

  • - Demolition work;
  • - Reinforced concrete work;
  • - Road work;
  • - Earth work;
  • - General building work;
  • - Surveying work;
  • - Aluminium joinery;
  • - External installations.

Performance time - August 2005 - January 2006

Net value : 4,044,000.- PLN

10

MITEX S.A.
Warszawa
ul. Postępu 5a

Complete execution of heavy insulation at FOCUS PARK building site in Bydgoszcz.

Performance time: August - December 2006

Net value of work: 1,015,000.- PLN

11


WARBUD S.A.
Warszawa
ul. Racławicka 146

Workmanship of expansion joint and insulation in connection with performing the assignment of building storage reservoirs together with flow control chambers and reconstruction of storm water drainage system in the area of the F. Chopin Airport in Warszawa.

Performance time: September - December 2006

Net value of work: 1,286,000.- PLN

12

METRO Group Asset Management Polska Sp. z o.o.
Warszawa
al. Krakowska 61

Reconstruction of Makro Supplies Centre in Poznań which included:

  • Demolition work;
  • Reinforced-concrete work;
  • Brickwork;
  • Flooring work;
  • Earth work;

Performance time - June 2006 - November 2006

Net value: 2, 575,025.- PLN

13

MRE Metro Group Real Estate Management Polska Sp. z o.o. Warszawa
al. Krakowska 61

Major repair of two-storey garage next to the "Skałka" Shopping Centre in Tychy which included:

  • - Modification design of static structure of the construction by introducing a structural expansion joint;
  • - Performance of reinforcing steel structure;
  • - Repair of concrete flooring with a thin-layer of PCC polymer cement concrete.

Performance time - May - August 2005

Net value: 1,516,460.- PLN

14

Hydrobudowa-6 S.A.
02-672 Warszawa
ul. Domaniewska 50a

Performance of specialist insulation work at the Tunnel construction site in sequence of Wisłostrada under Wybrzeże Kościuszkowskie (Kościuszko Embankment) in Warsaw, which includes:

  • Insulation coating of floor slabs and tunnel tank with Dualseal;
  • Protection of expansion joint with Tricomer Tricosal tapes;
  • Protection of working openings with Fuko hoses;
  • Bituminous insulation

Performance time - July 2001 - August 2003

Net value: 7,359,.470.- PLN

15

"INVESTMENT" S.A. Katowice,
ul. Żeliwna 43

General building work on a surface of approximately 3.500 m2 in a six-storey office building in Katowice in 23, Lwowska Street

  • Implementation of construction and performance project of air-conditioning system in the building
  • Demolition work
  • Performance of reinforced-concrete entrance structure and ramp
  • Building and assembly work
  • Installation work (work on water-supply and sewage system, central heating system, wiring and lighting system)
  • Flooring work
  • Performance and mounting of aluminium joinery
  • Finishing work

Performance time: April 2000 - December 2003

Net value: 6,114,980.- PLN

19

Hydrobudowa-6 S.A.
02-672 Warszawa
ul. Domaniewska 50a

Performance of complex anti-water insulation at building site of the Warszawa Underground Railway A13, A14, A17, A18.

Performance time: January 1998 - December 2004

Net value: 3,300,000.- PLN